I managed to get GBS set up today. Here are the results of the first run of the project through the program:
As easy to use as the system is, my skills with the modelling are still relatively rudimentary at this point, so take these results with a grain of salt.
There is a sizable cost for energy use throughout the year, which seems to be an area where more efficient design could bring cost benefits. As well most of these costs are for heating and ventilation. The construction of the project was modeled as concrete with rather minimal insulation. Some changes to these assemblies might produce better results.


No comments:
Post a Comment