Things are starting to move on the big box store. Today I got the space planning done and the basics of the model together. I had some fun getting things parametrically constrained so that as I moved walls and grid lines around, decisions that I had made regarding positioning would be retained. I haven't figured all the best ways to do things, but its starting.
My next step will be to assign the rooms and finishes, take a look at assemblies and structure and then I should be able to start extracting performance data.
Right now I have 12m x 10 m structural bays, a receiving / storage area in the bottom left surrounded by offices and bathrooms, and an entrance at the top with checkouts to one side. I still need to add a big garage door in the receiving area, probably some lights in the sales floor, and some signage / canopy at the front.


No comments:
Post a Comment